Active in Production - Network Wide

NETRA Platform

Network Planning &
Deployment Automation

NETRA replaces fragmented, spreadsheet-based deployment planning with a centralized, role-aware platform. It tracks every transmission plan across its complete lifecycle - from design upload and validation to multi-partner acceptance testing, regional traffic shifting, and coordinated dual-site dismantling.

Region Databases

Active Telemetry

Target SLA Rate
0%
Planning Success Rate
0%
Ageing Buckets
0–30 Days42%
31–90 Days41%
>180 Days17%
Region Progress
Metropolitan Region91%
Central Region89%
Coastal Zone76%
Centralized Rule Checks

Validates coordinate offsets, near/far-end bindings, and Pop overlaps automatically on plan upload.

Role-Scoped Lifecycles

Orchestrates task assignments across MW Planners, Region Deployment, I&C Partners, and region operations.

Acceptance Test Verification

Integrates physical photo proof audits with soft validation ping logs into a single sign-off desk.

Traffic Shift Gatekeepers

Ensures no traffic shifts are executed without active technology, configuration, and routing checks.

Interactive Walkthrough

Explore the lifecycle of network plans

NETRA orchestrates three critical lifecycles inside the region operations floor. Select a flow below to trace the steps, assignees, and decision loops.

01Rules Check

MW Planner

Upload & Verify

MW plan uploaded via Excel. System verifies coordinate math, nominal Pop ID matches, and hop distances.

02Material Prep

Deployment Team

Material & Prep

Deployment team gathers technical specifications, audits material lists, and assigns task to an Installation partner.

03Commissioning

I&C Partner

Install & Configure

I&C team conducts tower installation, configures IP interfaces, and uploads on-site installation proof.

04AT Sign-Off

MS Partner (AT)

Acceptance Test

AT desk validates physical installations (checking uploaded site images) and soft validations (ping tests, interface state logs).

05Operations

Region Ops

Traffic Shifting Gate

Operations team checks IP routes and technology configuration. If verified, traffic shifts to new link. Otherwise, returned to Planner.

Acceptance Testing (AT) Desk Verification Details

Once commissioned, the MS Partner team triggers two validation stages: Physical AT (matching multi-angle photos of antenna mount stability, grounding, and serial tags) and Soft AT (capturing automated CLI trace logs, latency, and interface alignment data). All checklists and logs are linked directly to the plan record for audit trails.

Live Operations Sandbox

The NETRA Operations Simulator

Interact with the visualizer steps below to see how NETRA parses design sheets, runs coordinate validation, conducts acceptance testing audits, and compiles circle-level reports.

Stage 1 Visualization

Excel Plan Validation

GRID CALIBRATION: ACTIVELAT/LONG PLOT
HOP DIST
4.21 km
NOMINAL QTR
VALID
POP BINDINGS
MATCH
Workflow: DeploymentSYSTEM LIVE
Live Console Logs
> Initializing NETRA Validation Engine v4.8...
> Reading file: mw_plan_release.xlsx

Role-Based Access

Unified coordination, scoped permissions.

NETRA coordinates actions across internal planning teams, region deployment engineers, third-party installation partners, and region operations leads.

MW Planner

Uploads design plans, runs coordinate checks, signs off designs, manages holds and cancellations.

Region Deployment

Coordinates material gathering, surveys site readiness, assigns installations to local partners.

I&C Partner

Performs site installation or dismantling, uploads physical deployment proof and system inputs.

AT Desk (MS Partner)

Validates physical and software acceptance test stages, reviewing logs and checklist images.

Region Operations

Gatekeeper for traffic shifting. Runs BGP/IP validation and handles final service activation.

Warehouse Manager

Performs intake audits for dismantled hardware, verifying serials against the decommissioning sheet.

Core Capabilities

Designed for region operations floor

Multi-Rule Plan Validation

Planners upload microwave designs directly. NETRA runs multi-rule check engines - verifying Pop IDs, nominal quarter coordinates, hop distance bounds, and link-type classifications instantly.

Nominal ValidationPop Presence CheckCoordinate Bounds

Ageing & Bottleneck Analytics

Automated age-bucket categorization helps managers identify pending tasks. Views are scoped dynamically: region leads see bottlenecks on a larger scale, while partner teams see only active assignments.

Ageing BucketsTeam SLA AlertingOps Bottlenecks

Coordinated Dual-Site Dismantling

Manages simultaneous dismantling for near-end and far-end microwave sites. Enforces pre-dismantle surveys, safety sign-offs, safe de-installation, and warehouse inventory logging.

Near-End / Far-End CoordinationSurvey ReadinessWarehouse Listing

Traffic Shift Gatekeepers

Enforces strict technical validation (IP ping readiness, subnet checking, technology compatibility) before live traffic is redirected, minimizing link activation fallouts.

IP VerificationTech CheckingRollback Gates

Stop tracking MW deployments in Excel.

Talk to our team about deploying NETRA for your regional networks - we'll walk through automated template setup, partner provisioning, and operations configuration.